The Tenement Redevelopment
The complete overhaul and redevelopment of a 1890's tenement on Glasgow's Southside.....
Monday, 30 January 2017
Monday, 16 March 2015
Sunday, 3 August 2014
Boarding Out and Plastering
![]() |
| Living room wall - original painted plaster uncovered under the flock wallpaper |
![]() |
| New timber windows by Blairs in dark grey RAL 7021 |
![]() |
| New kitchen wall - where the door to the larder used to be |
![]() |
| Kitchen chimney wall - with new boiler installed and new utility wall just visible to the far left |
![]() |
| Kitchen wall - where the units used to be. Showing the break through at high level to create our hidden bed cave |
![]() |
| Rear bedroom to be dressing room with ensuite shower room plastered |
![]() |
| Bathroom completely boarded out to take tanking |
![]() |
| New shower valve and wc to stripped out bathroom. Tanked with the amazing Hydroban by Laticrete UK |
Initial Build
![]() |
| New kitchen wall built up with new large opening |
![]() |
| Entrance door on the right looking to hall |
![]() |
| Living Room/workshop... |
![]() |
| Opening between to be dressing room and bedroom |
![]() |
| Bedroom through to to be dressing room - just a little peak of the original cast iron fire surround that we uncovered when stripping out |
Strip Out
![]() |
| Entrance hall looking down to bathroom and bedroom doors |
![]() |
| Entrance door with wallpaper stripped taken off |
![]() |
| Living room with fireplace - the surround is stripped, varnished and reused |
![]() |
| Wall of living room with doors to hall and store removed, aco propped and starting to be taken down |
![]() |
| Living Room bay window with badly fitting upvc windows |
![]() |
| Looking through to living room from hall - with all store and kitchen walls removed |
![]() |
| Bathroom from bedroom through wall that is removed - pretty horrible! |