Sunday, 3 August 2014

Boarding Out and Plastering


Living room wall - original painted plaster uncovered under the flock wallpaper

New timber windows by Blairs in dark grey RAL 7021

New kitchen wall - where the door to the larder used to be

Kitchen chimney wall - with new boiler installed and new utility wall just visible to the far left

Kitchen wall - where the units used to be.  Showing the break through at high level to create our hidden bed cave

Rear bedroom to be dressing room with ensuite shower room plastered

Bathroom completely boarded out to take tanking

New shower valve and wc to stripped out bathroom.  Tanked with the amazing Hydroban by Laticrete UK

No comments:

Post a Comment